Gianti Logistics, a member of the Project Logistics Alliance from Georgia, has successfully completed a shipment of seven transformers and their accessories from Port of Poti to Tskaltubo. The cargo was moved to the Gianti terminal for temporary storage before being loaded onto multi-axle hydraulic modular trailers for the rest of the journey.
Video Credit: Gianti Logistics
The transformers and accessories were intended for use in an electrical transmission system operated by the Georgian government. The shipment included four larger transformers measuring 8 x 4 x 4.6 meters and weighing 135 tons each, as well as three smaller transformers weighing 91 tons each and measuring 6 x 3.3 x 4.69 meters. To meet the client's request, the team at Gianti developed a jack and slide solution that involved using hydraulic turntables to rotate the transformers into place.
Despite the challenges faced during the project, the capabilities of the Gianti team were showcased as they successfully transported the cargo on schedule. The company's commitment to safety and precision ensured that there was no damage to the transformers or any other equipment during the transportation process.
The successful completion of the shipment is a significant achievement for Gianti Logistics and reflects their expertise in project logistics. The team's ability to overcome challenges and ensure the smooth transportation of the cargo demonstrates their dedication to providing top-notch services to their clients.
Congratulations to Gianti Logistics on the successful completion of this project, and best wishes for their future endeavours.
Related links:
Website Gianti Logistics
LinkedIn Gianti Logistics
Twitter Gianti Logistics